Hardisty Connectivity Project.
Completed detailed engineering and DBM for a pipeline connection to a terminal manifold. The scope involved:
NPS 36 pipeline (EP to YP) connectivity from terminal fenceline / right-of-way to manifold including receiving trap
Routing above grade on pipe racks and then underground until connection to the manifold
Connectivity at manifold included connections to the existing tank suction lines and the future tank to allow for crude deliveries from the new incoming pipeline to any of these tanks
Batch Detection Building
Pipeline Connection to Line Pump Suction scope involved:
NPS 36 pipeline to be connected to pump station suction - line was installed on new pipe rack that went south past the manifold
Pipeline Line 67 Connection to Line 4 scope involved:
Line 67 NPS 30 jump-over connection to Line 4 for emergency supply to Line 4 mainline pump
Emergency power to Emergency Shutdown Valves


Services Provided
Engineering
CLIENT SCHEDULE INDUSTRY
Enbridge 2012-2018 Energy